Ongoing Projects

Today OJSC "Volgomost" is currently working on over 40 major projects on the territory of the Republic of Tatarstan, Mordovia, Southern Ossetia-Alania and Karachaevo-Cherkesia; in the Ulyanovsk, Samara, Penza, Ryazan, Oreburg, Saratov, Volgograd and Astrakhan regions, in the Krasnodar Krai. Below are some of the most significant ongoing projects.

   1. The construction and reconstruction of the Volga M-7 motorway road from Moscow through Vladimir, Nizhny Novgorod, Kazan to Ufa. The reconstruction of the Volga M-7 motorway road – from Moscow through Vladimir, Nizhny Novgorod, Kazan to Ufa in the area between 941+000 – 957+400 km, the Republic of Tatarstan.

   2. The reconstruction of the Ural M-5 motorway road from Moscow through Ryazan, Penza, Samara, Ufa to Chelyabinsk in the area between 1466+030 – 1480+000 km. The bridge through the Belaya river (the left structure).

   3. Reconstruction of the bridge through the B.Tsivil river (left) on the 677+174 km of the Volga M-7 motorway road of Moscow – Vladimir – Nizhny Novgorod – Kazan – Ufa.

   4. The construction of the bridge overpass through the ship canal in the city of Balakovo in Saratov region. Second stage.
 
   5. The construction of the detour of the city of Krasnoslobodsk to the Entrance to the city of Saransk from the Ural M-5 motorway road. II start-up facility.

   6. Reconstruction of the Ural M-5 motorway road from Moscow through Ryazan, Penza, Samara, Ufa to Chelyabinsk in the area between 634 – 645 km with the bridge through the Sura river of Penza region.

   7. Reconstruction of the 1P 228 motorway road from Syzran – Saratov – Volgograd. The construction of the motorway road P-228 from Syzran – Saratov – Volgograd in the area between 250 km – 265 km as a detour of the village of Elshanka of Saratov region.

   8. Construction of the motorway road Entrance to the city of Orenburg from the Ural M-5 motorway road in the area between 96 – 147 km of Samara region. II, III start-up facilities.

   9. Reconstruction of the bridge overpass through the Sakmara river on the 3+300 of the motorway road. Entrance to the city of Orenburg from the motorway of Kazan – Orenburg in the Sakmara district of Orenburg region.
 
   10. Construction of the bridge overpass through the Volga river in the city of Volgograd. II start-up facility.

   11. Construction of the overpass on the Entrance from the Kaspy M-6 motorway road regional and intermunicipal motorway road on the 13+400 km of Volgograd region.

   12. Reconstruction of the A-155 motorway road of Cherkessk-Dombay to the border of the Georgian Republic in the area between 83+000 – 88+700 with the construction of the bridge-overhead road through the Kuban river into the Republic of Karachaevo-Cherkessia, II, III start-up facility.

   13. Construction of the A-153 motorway road from Astrakhan – Kochubey – Kizlyar – Makhachkala in the area of Liman – the boarder of the Republic of Kalmykia, Astrakhan region.

   14. The execution of a series of jobs on the reconstruction of the Don  M-4 highway – from Moscow through Voronezh, Rostov-on-Don, Krasnodar to Novorossiysk in the area between 1250 – 1319 km, 1373+906 – 1383+036 km, Krasnodar Krai (document production in engineering, preparation of the territory, reconstruction).

   15. Construction of the Tsentralny airport system (the city of Saratov) phase I of construction project (territories of federal ownership).

   16. Construction of the bridge through the Sura river on the 111+630 km of the 1P-178 motorway road from Saransk – Surskoe – Ulyanovsk in Ulyanovsk region.

   17. Construction of bridge overpass through the Kama river by the Sorochyi Gory village on the motorway road from Kazan – Chistopol – Bugulma. Phase II of construction.

   18. Reconstruction of the road segments Moscow large ring through Dmitrov, Sergiev Posad, Orekhovo-Voskresensk, Mihnevo Balabanovo, Ruza, Wedge (with access to the State Complex "Tarussa" and passages on its territory). Construction of the overpass on the highway Moscow large ring through Dmitrov, Sergiev Posad, Orekhovo-Voskresensk, Mihnevo Balabanovo, Ruza, Wedge (with access to the State Complex "Tarussa" and passages on its territory) per km 2 area of the Minsk highway to Volokolamsk highway, Moscow region.

   19. Reconstruction of the road from the highway to Kiev Kaluga highway (Salarevo village - the village Mamyri).
  
   20. Construction and reconstruction of the road M-5 "Ural" - from Moscow through Ryazan, Penza, Samara, Ufa and Chelyabinsk. Reconstruction of the road M-5 "Ural" - from Moscow through Ryazan, Penza, Samara, Ufa and Chelyabinsk in 1375 on a plot of 000 km - 000 km in 1401, the Republic of Bashkortostan (I phase II launch complex 00 0 PC - PC 142 + 50 stage I and III launch facility PC 142 50 - 164 00 PC)